New Gravimetric Weighing System and Vacuum Feeders
New gravimetric system (module G) and vacuum feeders can be retrofitted to all W&H blown film lines as well as extrusion equipment of other manufacturers.
Installation
Installation of gravimetric system and vacuum feeders, including all components, will be done by W&H service technicians.
Installation: approx. 1 – 2 days per gravimetric system and vacuum feeder (including training)
VAREX Extruders
VAREX retrofit extruders are available for all W&H lines as well as other systems.
Installation
Installation of extruders, including all components, will be done by W&H service technicians.
Installation: 1 – 2 days per extruder (including training)
New MAXICONE Die Heads and Dies
New MAXICONE die heads and dies can be retrofitted to all W&H blown film lines as well as other systems.
Installation
Die head installation, including all necessarycomponents, will be done by W&H service technicians.
Installation: approx. 5 days (including training)
ARCTIS Air Ring
Increase your output and film quality by retrofitting W&H dies or ARCTIS air rings, which are available for W&H and other dies. A new gauge profile controller is available as an additional option.
Installation
Installation of ARCTIS retrofit packages, including all components, will be done by W&H service technicians.
Installation: approx. 5 days (including training)
VARIOCAGE
Improve film width tolerances with optimal calibration that saves trim and satisfies your customers with its operating properties – all with the non-contact NOSTIC cage.
The VARIOCAGE film calibration unit ensures tight tolerences.
Installation
The film calibration unit and components are assembled by W&H service technicians.
Installation: approx. 2 days (incl. training)
PROFILE BOOSTER
Increases the effective up-time of your blown film line through intelligent die and/or air ring control at line start, ensuring fast saleable quality production and short job change times.
PROFILE BOOSTER helps you reach the desired gauge profile, and with it saleable production, faster.
Installation
Adaptation of existing control system and change of hardware components (if necessary) will be done by W&H service technicians.
Installation: approx. 1.5 days (including training)
MMC Retrofit
Get ready for the future and boost your blown film production by retrofitting state-of-the-art MMC* control technology.
Installation
Retrofitting of control hardware and of appropriate operator control elements will be done by W&H service technicians.
*) MMC stands for Siemens Multi Micro Computer
RMOS-IPC Retrofit
Replacement of previous RMOS-IPC hardware with the latest Windows APC 620 technology.
Installation
Retrofitting of components and replacement of the appropriate elements will be done by W&H service technicians.
Installation: approx. 1 day (including training)
ISP Retrofit
The Information System Production (ISP) is a software package that allows you to keep track of your film production and to have the process data of your W&H blown film lines recorded and printed out.
ISP Retrofit
nstallation: approx. 1 day (including training)
Module XTENSION
This module allows for easy integration of customer supplied components such as vacuum feeders, gravimetric systems, chillers, draws, winders, etc. … into VAREX blown film extrusion lines.
The XTENSION module retrofitted into the PROCONTROL TS operator column gives simple and safe operation of customer supplied components integrated into a W&H VAREX blown film extrusion line.
Installation
For electric interfacing of customer supplied components with the PROCONTROL TS column, B&R control modules will be provided and installed. Installation of the necessary software will be done by W&H service technicians.
Installation: approx. 1 day (including training)
FILMATIC-Winders
Easy processing with a smart design: With a film winder from W&H's comprehensive FILMATIC range, you can offer perfect, straight-edged rolls from start to finish.
Installation
Filmatic winders and components are assembled and installed by W&H service technicians
Installation including training: approx. 5 days (depending on requirements)
Retrofit Solutions for Cast Film Lines
FILMEX Extruders
Upgrade your cast film line by retrofitting high performance FILMEX extruders with SMB (Smooth Barrier) screws and crosshole mixing sections.
FILMEX extruders can be retrofitted on all cast film lines, including W&H and others.
Installation
Installation of extruders including all components either by W&H service technicians or by customer.
Installation: approx. 1- 2 days per extruder (including training)